Supply of T.W. cistern and cushion intermediate feed cistern 16" x 9" x 18" with mica ball valve and mica 10.1" feed pipe connected into return pipe.

4. Circulating pipes.

1 1/4" W.I. circulating pipe, connecting the boiler and hot water cistern, the return pipe being carried under the secondary flue to the bath tower and back.

1/2" W.I. flow and return pipe, to be carried from the boiler under the corridor floor to the sword blacksmith's workshop and boiler house. 1/4" flow and return pipe to the bath tower and blacksmith's workshop.

All the pipes to be laid to regular fall, to facilitate circulation and to be supported under the concrete floor on proper brackets and hangers. The circulating pipes to be well clothed with felt and covered with two coats of ...

6. Laying on. Animal supply cock with stop valve, with inch draw off pipes for emptying boiler. Hot water services from the circulating pipe to the different bath rooms and bath tubs, with proper Ts and connections and services to dispensary branch of the lavatories and to scullery sinks.

Woodwork

A. Jaw half-inch form metal bib cocks screwed for half-inch pipe with stop valves and branches to lavatories and 3/4" cocks and shutters to sinks. Track metal bib cocks screwed with four-way pipes, with wood-covered handles, for hot water to each bath and to bath tubs.

6. Generally, All the W.I. Pipes to be equal to steam, put together with un-leakage joint and red and white lead, with all necessary Ts, bends, elbows, long screws, back nuts, etc.

Lift.

Provide and fix a hand-power lift with inside dimensions: The lift to be 3'6" high and 2'0" x 2'0" fitted with shallow sliding tray and lift. The height through which the lift travels is ... (Overlayed detail drawing should be prepared to show exact space available).

Page 90

Page 91

Edit History

2026-05-21 09:20:55 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Supply of T.W. cistern and cushion intermediate feed cistern 16" x 9" x 18" with mica ball valve and mica 10.1" feed pipe connected into return pipe. 4. Circulating pipes. 1 1/4" W.I. circulating pipe, connecting the boiler and hot water cistern, the return pipe being carried under the secondary flue to the bath tower and back. 1/2" W.I. flow and return pipe, to be carried from the boiler under the corridor floor to the sword blacksmith's workshop and boiler house. 1/4" flow and return pipe to the bath tower and blacksmith's workshop. All the pipes to be laid to regular fall, to facilitate circulation and to be supported under the concrete floor on proper brackets and hangers. The circulating pipes to be well clothed with felt and covered with two coats of ... 6. Laying on. Animal supply cock with stop valve, with inch draw off pipes for emptying boiler. Hot water services from the circulating pipe to the different bath rooms and bath tubs, with proper Ts and connections and services to dispensary branch of the lavatories and to scullery sinks. Woodwork A. Jaw half-inch form metal bib cocks screwed for half-inch pipe with stop valves and branches to lavatories and 3/4" cocks and shutters to sinks. Track metal bib cocks screwed with four-way pipes, with wood-covered handles, for hot water to each bath and to bath tubs. 6. Generally, All the W.I. Pipes to be equal to steam, put together with un-leakage joint and red and white lead, with all necessary Ts, bends, elbows, long screws, back nuts, etc. Lift. Provide and fix a hand-power lift with inside dimensions: The lift to be 3'6" high and 2'0" x 2'0" fitted with shallow sliding tray and lift. The height through which the lift travels is ... (Overlayed detail drawing should be prepared to show exact space available). Page 90 Page 91
Baseline (Original)
V supply of t.w.ciston a cushim intermediile of feed custom 16" x 9" x 18" waits mich hamballeak and copfuball and mich 10.1 . feed pipe comected into return pipe 4. Ericulating pipes. 14/4" W. J. ericulating pipe, lectureen the boils and hot water cisline, the return pipe being carried. under the secondale Flame to the bath lower at and black. 1/4" 1/2" W.1. flow and alter pipe, to be conied. from the boiler under the corridor flon to the sword blackp with few per t press introter fort're suvices of the administration ward "And Sward blackp. 1/4" flow and atorme super & the bath tower and badmin tratar All the pipes the laid to regular fall, for to facilitat the criculation and to be supported under the comecete flames on proper Leavers and hanger. The circulating fipes the well clothed with felt chard Bowes, fornited two coats. 89 6. Laying on. Animal somnutal cock with im oformer, with inch draw off pipes for complying boiler Touch 10. J. Lohwater sewices from the criculating super to the different bath rooms and bath tricks, with proper Ts and commection and serices dispensary brach of the lavatories and to sealley sinks . woodwork A Jaw half inch form metal bib cactes sereived for halfinch sim pipe with brun & fommers brach lavating and 3⁄4/ cacks and shamses Blinks. Track you Inetal hibcrctes ou sereived with for wom pipes, um with wood covered houndle, for hoheater to each butt and tobattlinks. 6. Generally, All the W. T. Pipes Bhe equalto stem, puck together with unerlocken Joint and red and white lead, with all mumsary To, hands, Ellows, long screws, back muticle. Lift. Provide and fix a hound power lift au immacun inside dimension : The lift the 360° high and 20" fitted with shallow slicking hays bizfart. The Leight through which the felist blik in pt. (Omenlayed si required detail drawing should be preponed to thows exach spac available, Page 90Page 91
2026-05-21 09:20:55 · Baseline
View content

V

supply of t.w.ciston a cushim intermediile

of

feed custom 16" x 9" x 18" waits mich hamballeak

and copfuball and mich 10.1 . feed pipe comected into return pipe

4. Ericulating pipes.

14/4" W. J. ericulating pipe, lectureen the boils and hot water cisline, the return pipe being carried. under the secondale Flame to the bath lower at and black.

1/4"

1/2" W.1. flow and alter pipe, to be conied. from the boiler under the corridor flon to the sword blackp with few per t press introter fort're suvices of the administration ward "And Sward blackp. 1/4" flow and atorme super & the bath tower and badmin tratar

All the pipes the laid to regular fall, for to facilitat the criculation and to be supported under the comecete flames on proper Leavers and hanger. The circulating fipes the well clothed with felt chard Bowes, fornited two coats.

89

6. Laying on. Animal somnutal cock with im oformer, with inch draw off pipes for complying boiler Touch 10. J. Lohwater sewices from the criculating

super to the different bath rooms and bath tricks,

with proper Ts and commection and serices

dispensary brach of the lavatories and to sealley sinks .

woodwork

A

Jaw half inch form metal bib cactes sereived for

halfinch sim pipe with brun & fommers brach lavating and 3⁄4/ cacks and shamses Blinks. Track you Inetal hibcrctes ou sereived with for wom pipes,

um

with wood covered houndle, for hoheater to each butt and tobattlinks.

6. Generally, All the W. T. Pipes Bhe equalto stem, puck together with unerlocken Joint and red and white lead, with all mumsary To, hands, Ellows, long screws, back muticle.

Lift.

Provide and fix a hound power lift

au immacun

inside dimension : The lift the 360° high and

20" fitted with shallow slicking hays bizfart. The Leight through which the felist

blik in pt. (Omenlayed

si required

detail drawing should be preponed to thows exach spac

available,